Anatomy of Home Remodeling

Approaching your home remodel project in a systematic, planned and structured way is the best way to get the results you expect out of the project. Home remodeling Ames Iowa is exciting as well as the tricky subject. Here are the different steps to go about your home remodeling mission.

  • Step-1
    Hiring the right contractor for your home remodeling is the first step. The important aspects to note here is whether the contractor you choose is bonded and licensed. Go through some customer reviews to ascertain the satisfaction levels they have guaranteed in their earlier works. Studying a handful of options and landing on the bet one is the right way out.
  • Step-2
    Once the room layout and design are completed, the next step is to obtain the necessary permits from the concerned authorities. Building permit and electrical permit are essential. Usually, a good contractor will take care of obtaining them on your behalf.
  • Step-3
    Protect the job site with plastic sheets hung and the floors covered. This is necessary to prevent any damages during demolition if there are any. The materials accumulated during deconstruction can be used once again or sold or donated to good causes.
  • Step-4
    Gather together all the products that the structure demands including framing for new walls, decorative hardware, a new shower as in the case of residential bathroom remodeling Ames Iowa, a toilet, doors, windows, skylights and other fittings and additions as necessary.
  • Step-5
    This stage involves plumbing works, laying new drains, water pipes, and water lines, laying new wires for additional outlets necessary, and installing lights, switches, lighting fixtures, accessories and other appliances as per the plans.
  • Step-6
    A request is submitted for plumbing, electrical and framing inspection. This is done by the concerned local government authorities.
  • Step-7
    Once the inspection gives a green signal, insulations are installed if any are necessary. In some jurisdictions, you are required to submit the photographs of the insulations for the installations to be passed.
  • Step-8
    During this stage, you can plan the painting if there are no other works pending that can cause some scratches on the paintings. You can either do the painting now and carry out the touch-ups if required later or choose to paint at a later stage.
  • Step-9
    Install the flooring. Depending on what type of floor you go for, it can take varying timelines to complete. Install them to a point that the new floor can be walked on without any damages to them. Around this time, you can also install the wainscoting and tile shower surrounds. After curing the floors, protect them by placing a Ram Board for instance.
  • Step-10
    During this stage, you can install the cabinetry and countertops and other appliances you have planned. However, once the countertops are installed, give not less than 12 hours before installing the appliances so that the adhesive is cured well.
  • Step-11
    This is the time to finish the plumbing and electrical works and faucets, hot-water dispensers, decorative lightings, cover plates, and others.
  • Step-12
    Once all the works mentioned above are completed as per your plans, you can call for final inspection. You can allow four working days for the inspector to carry out the inspection. When the project has received the final inspection signoff, you can remove the job site protection and clean up the site.
  • Step-13
    Ask the contractor to give you a walk-through of the entire project to identify issues that concern you and correct them before they commission the project to you. Make a thorough inspection personally spending enough time so that any major and minor rectifications necessary are done before you make the final payment.
 